Nammuldi Project Works - Rail
Slattery prepared a Definitive Engineering Study (DES) for a rail loop at Nammuldi’s Central Site (C-site) for Rio Tinto in accordance with Rio Tinto’s design criteria and estimating guidelines with a nominal cost accuracy of -10/ +15%.